Quick and safe staff access to the Vinjan viaduct pillar / construction hoist

At the Vinjan construction site (Drugi tir/2TDK project), we installed a closed construction hoist for safe and quick access for personnel to the top of the viaduct.

Gradbeno dvigalo na Viaduktu Vinjan, projekt Drugi tir 2023

About the project

Client
Kolektor CPG d.o.o.

Location
Vinjan, Slovenia

Description
At the Vinjan construction site (Drugi tir/2TDK project), we installed a closed construction hoist for safe and quick access for personnel to the top of the viaduct.

Year
2023-2024

Link
Železniški viadukt Vinjan

Our solution

Fast and safe transport

The closed construction hoist enables fast and safe transportation of people.

Due to its carrying capacity, it can bring more than 20 people to or from the pillar in just a minute and a half.

Professional preparation, installation, operator training and inspection by an authorized institution after installation ensure safety at the highest level.

Little space to install the hoist

Due to the steep terrain, there is very little space next to the column for mounting the hoist.

Together with the client, we found such a solution that we placed a customized entrance to the basket and brought it as close as possible to the column.

Customized anchoring

The anchoring was carried out without drilling additional holes in the viaduct column.

For anchoring, we used the existing formwork holes and the reduction profile, which is used as a compensation between the basic width of the anchor and the holes on the column.