Joint planning
We held several meetings and coordination with the management of the construction site to really make the best use of the cranes on the construction site, where we were limited by the space around the building itself, as well as by the possibility of access for dismantling the cranes after the building is built.
A lot of time was devoted to planning and coordination with the construction process, and much more time was thus saved during implementation.